Town of Kindersley Budget Summary 2024
The Town of Kindersley has released a summary of the 2024 Budget. Here are some of the highlights.
2024 Uniform Mill Rate: 11.1
The increase of 0.3 mills was required to offset the increase in operating expenses, such as power, energy, fuel, and carbon tax. Both residential and commercial minimum taxes were increased by $200.00.
2024 Capital Projects Include:
Infrastructure:
11th Avenue East Paving
Full road reconstruction from Main Street to 2nd Street East
Knox Street
Full road construction from Coleman Crescent to Thomson Drive
Includes sidewalks
100 Block of 3rd Avenue East
Asphalt resurfacing from Main Street to 1st Street East
2nd Avenue Storm Water Management
Install a storm water lift station and force main to aid in storm water management
Lagoon Aeration Blower
Replacement of current asset
Cast Iron Water Main Replacement
Six blocks, various locations
Annual Fleet Management:
Trucks
Two 1/2 tons as per fleet management
Mini Excavator
New addition to our fleet to aid in operations predominately in the cemetery
John Deere Gator
As per fleet management program
Tractor
Trade in existing tractor as per fleet management program
Senior Transportation Bus
Trade in existing bus as per fleet management program
Facilities & Green Spaces:
West Central Events Centre Plant Upgrades
Upgrade to the refrigeration plant using a safe, non-toxic, non-flammable refrigerant
West Central Events Centre Stadium Seats
500 Folding stadium seats
Motherwell Beach Development
New playground equipment
New Playground on 7th Street West
Landscaping and playground equipment
Shop Buildings
Purchase of RM shop buildings at 408 Railway West